Products Description
Bldc servo motor can be understood as a motor that absolutely follows the control signal command: the rotor is still before the control signal is sent; the rotor rotates immediately when the control signal is sent; and the rotor can stop immediately when the control signal disappears.
Specifications:
|
Flange |
SQ-1 |
Rated Voltage |
Rated Power |
Rated Torque |
Rated Current(A) |
Rated Speed (rpm) |
|
40 |
40AST-M00130 |
24V |
50W |
0.16 |
2.6 |
3000 |
|
40 |
40AST-M00330 |
24V |
100W |
0.32 |
5.2 |
3000 |
|
60 |
60AST-M00630 |
24V |
200W |
0.637 |
12 |
3000 |
|
80 |
80ST-M01330 |
24V |
400W |
1.27 |
20 |
3000 |
|
80 |
80ST-M02430 |
24V |
750W |
2.39 |
34 |
3000 |



Advantages:
The bldc servo motor has better motion stability, less vibration at variable speed, high starting torque, simpler structure, and relatively low manufacturing cost.

Applications:
Printing industry: automatic paper delivery machine, computer three-sided bag sealing machine, non-axis high-speed full-amplitude offset printing machine, etc.



Certificates:

Exhibitions:


Why choose us?

FAQ
1. Q: Is there a MOQ for your motors?
A: We have no requirement for MOQ.
2.Q:How to select a suitable motor?
A:If you have motor pictures or drawings to show us, or you have detailed specs like voltage, speed, torque, motor size, working mode of the motor, needed life time and noise level etc, please do not hesitate to let us know, then we can recommend suitable motor per your request accordingly.
3.Q:When will you reply after got my inquiries?
A:We will response within 24 hours once get your inquires.
4.Q:Can I have samples for testing first?
A:Yes, definitely you can. After confirmed the needed motor specs, we will quote and provide a proforma invoice for samples, once we get the payment, we will get a PASS from our account department to proceed samples accordingly.
5.Q:What's your lead time?
A:Generally speaking, our regular standard product will need 25-30days, a bit longer for customized products. But we are very flexible on the lead time, it will depends on the specific orders
















